Larks Green is a 70MWp solar PV and 49.5MW Battery storage project situated across 106 hectares of land in Itchington, Southwest England. It was developed as a joint venture with Enso Energy and achieved energisation in April 2023.
It was the first solar PV project in the UK to feed electricity directly into the transmission network.
The Larks Green solar project is designed to deliver a 25% biodiversity net gain because of efforts to strengthen 9.9km of hedgerow and the planting of new wildflowers over 9 hectares of the site.